19455
post-template-default,single,single-post,postid-19455,single-format-standard,elision-core-1.0.10,everest-forms-no-js,ajax_fade,page_not_loaded,qode-child-theme-ver-1.0.0,qode-theme-ver-4.4,wpb-js-composer js-comp-ver-6.3.0,vc_responsive
Title Image

Blog

Union-built 310-MW solar + storage project comes online in California

  |   Solar, solar industry

Intersect Power started the commercial operation of its Athos III solar project in Riverside County, California, on December 22, 2022. The Athos III solar project was built by union labor, with American-made solar panels, batteries and steel piles, and it is expected to meet the domestic content and prevailing wage requirements for tax credit incentives…

The post Union-built 310-MW solar + storage project comes online in California appeared first on Solar Power World.