-1
archive,paged,category,category-uncategorized,category-1,paged-50,category-paged-50,elision-core-1.0.10,everest-forms-no-js,ajax_fade,page_not_loaded,qode-child-theme-ver-1.0.0,qode-theme-ver-4.4,wpb-js-composer js-comp-ver-6.3.0,vc_responsive
Title Image

Uncategorized

  |   Uncategorized

Cleantech Solar to help Siemens cut carbon footprint

The ‘captive mode’ solar plant installed by Cleantech Solar shall power Siemens’ manufacturing facility located at Kalwa in Maharashtra.  Singapore-headquartered Cleantech Solar, a renewable energy solutions provider to corporates in India and Southeast Asia, today announced that Siemens Limited has executed an agreement to purchase power...

Read More
05 November
0
  |   Uncategorized

Duracell launches 14 kWh battery for residential PV

The US battery manufacturer entered the stationary storage business with a new product for residential customers. The lithium iron phosphate (LFP) battery is compatible with new or existing PV systems. US alkaline battery Duracell, a unit of US holding company Berkshire Hathaway, has entered the stationary...

Read More
05 November
0
  |   Uncategorized

Compressed-air storage for commercial applications

Israel-based Augwind has built its first 250 kW/1 MWh compressed air storage system for the collective community of Yahel, in the southern, desert part of the country. The commercial scale facility will be connected to a PV system and will be used for behind-the-meter services. From...

Read More
29 October
0
  |   Uncategorized

Siemens raises 26% stake in solar plant for self-consumption

The captive solar plant in Mumbai is being developed by Cleantech through a special purpose vehicle called Sunsole Renewables. The solar electricity generated will power manufacturing operations at Siemens’ Kalwa factory in Maharashtra. Germany-headquartered engineering firm Siemens Limited today signed an agreement to raise 26% of...

Read More
24 October
0
  |   Uncategorized

The long read: PV backsheets – replace or repair?

Backsheet chalking, especially of polyamide backsheet films, doesn’t take long to lead to cracks and then safety shutdowns. Sometimes, though, the period may be much longer or shorter than expected. Assessing the risk and whether on-site repairs offer a long-term solution is currently a topic...

Read More
24 October
0