599
paged,page-template,page-template-blog-large-image,page-template-blog-large-image-php,page,page-id-599,page-child,parent-pageid-1815,paged-141,page-paged-141,elision-core-1.0.10,everest-forms-no-js,ajax_fade,page_not_loaded,qode-child-theme-ver-1.0.0,qode-theme-ver-4.4,wpb-js-composer js-comp-ver-6.3.0,vc_responsive
Title Image

Large Image

FAME II subsidy scheme extended by two years

  |   Uncategorized

The second phase of the Faster Adoption and Manufacturing of (Hybrid) and Electric Vehicles (FAME) subsidy scheme to promote electric mobility in India will now run until March 31, 2024.  The Indian government has extended the second phase of the Faster Adoption and Manufacturing of (Hybrid) and Electric Vehicles (FAME)...

Read More

Solar panels by the side of a lake

  |   Uncategorized

A 500 kW solar project by the side of the Bada Talab in Bhopal, Madhya Pradesh, uses 1,540 PV panels supported through cantilever frame. The installation runs 1.2 km. From pv magazine India The Indian State of Madhya Pradesh hosts a 500 kW solar project by the...

Read More