19071
post-template-default,single,single-post,postid-19071,single-format-standard,elision-core-1.0.10,everest-forms-no-js,ajax_fade,page_not_loaded,qode-child-theme-ver-1.0.0,qode-theme-ver-4.4,wpb-js-composer js-comp-ver-6.3.0,vc_responsive
Title Image

Blog

Bank of America’s Arizona campus now 60% powered by solar portfolio

  |   Solar, solar industry

Ameresco has announced the completion of a comprehensive solar PV installation for the Bank of America corporate campus in Chandler, Arizona. The campus is now home to nearly 10,000 solar modules that will offset approximately 60% of the electricity demands of the campus annually. The solar installations include arrays on building rooftops and covered carports,…

The post Bank of America’s Arizona campus now 60% powered by solar portfolio appeared first on Solar Power World.