19515
post-template-default,single,single-post,postid-19515,single-format-standard,elision-core-1.0.10,everest-forms-no-js,ajax_fade,page_not_loaded,qode-child-theme-ver-1.0.0,qode-theme-ver-4.4,wpb-js-composer js-comp-ver-6.3.0,vc_responsive
Title Image

Blog

Silicon Ranch flips switch on 3.25-MW Tennessee solar project

  |   Solar, solar industry

Silicon Ranch Corporation and Bolivar Energy Authority (BEA) flipped the switch on the new 3.25-MWAC Bolivar Solar Farm in Hardeman County, Tennessee, along with Tennessee Valley Authority (TVA). The solar facility will provide enough low-cost solar energy to power more than 500 homes and help keep rates low for BEA’s more than 11,000 customers. Despite…

The post Silicon Ranch flips switch on 3.25-MW Tennessee solar project appeared first on Solar Power World.