18045
post-template-default,single,single-post,postid-18045,single-format-standard,elision-core-1.0.10,everest-forms-no-js,ajax_fade,page_not_loaded,qode-child-theme-ver-1.0.0,qode-theme-ver-4.4,wpb-js-composer js-comp-ver-6.3.0,vc_responsive
Title Image

Blog

Longroad Energy developing 160-MW Hawaiian solar + storage project

  |   Solar, solar industry

Longroad Energy was selected by Hawaiian Electric Company (HECO) to begin developing two utility-scale solar + battery storage projects for completion in 2023. The proposed projects include the 120 MWac/480 MWh Mahi Solar in Kunia, O’ahu, which would be the state’s largest solar project to date, and the 40 MWac/160 MWh Pulehu Solar in Pulehu,…

The post Longroad Energy developing 160-MW Hawaiian solar + storage project appeared first on Solar Power World.