1868
paged,page-template,page-template-blog-large-image,page-template-blog-large-image-php,page,page-id-1868,page-child,parent-pageid-1815,paged-281,page-paged-281,elision-core-1.0.10,everest-forms-no-js,ajax_fade,page_not_loaded,qode-child-theme-ver-1.0.0,qode-theme-ver-4.4,wpb-js-composer js-comp-ver-6.3.0,vc_responsive
Title Image

Large Image With Sidebar

US fossil fuel developer goes solar with 350 MW project

  |   Avondale Solar, Electric Reliability Council of Texas, ERCOT, J-Power USA, Markets, photovoltaic, photovoltaics, Plus Renewables, PV, PV modules, PV plant, Red-Tailed Hawk Solar, renewable energies, Renewable Energy, Renewables, Solar, solar energy, solar panels, Solar Plus Development, Solar PV, Utility Scale PV

The economics of a solar project in Texas are so compelling coal and gas developer J-Power wants a piece of the action.From pv magazine USA. The 350 MWac Red-Tailed Hawk Solar project planned by the U.S. business of Japan’s largest coal-fired power station operator will be...

Read More

US fossil fuel developer goes solar with 350 MW project

  |   Avondale Solar, Electric Reliability Council of Texas, ERCOT, J-Power USA, Markets, photovoltaic, photovoltaics, Plus Renewables, PV, PV modules, PV plant, Red-Tailed Hawk Solar, renewable energies, Renewable Energy, Renewables, Solar, solar energy, solar panels, Solar Plus Development, Solar PV, Utility Scale PV

The economics of a solar project in Texas are so compelling coal and gas developer J-Power wants a piece of the action.From pv magazine USA. The 350 MWac Red-Tailed Hawk Solar project planned by the U.S. business of Japan’s largest coal-fired power station operator will be...

Read More

Bangladeshi solar module companies seek Covid-19 stimulus package

  |   Community, Ministry of Finance and Commerce, Modules & Upstream Manufacturing, solar rooftops

Industry representatives call for a $59 million, five-year package of grants, loans and tax incentives from the government after Dhaka extended a coronavirus-driven industrial shutdown into the middle of the month. Solar manufacturers in Bangladesh have asked for government support after being crippled by a 40-day...

Read More

Bangladeshi solar module companies seek Covid-19 stimulus package

  |   Bangladesh Incentive Package-2, Bangladesh Solar and Renewable Energy Association, Community, Coronavirus, Covid-19, Covid-19 solar industry stimulus, Covid-19 solar panel material shortages, Employment, Finance, Markets, Ministry of Finance and Commerce, Modules & Upstream Manufacturing, Policy, Sheikh Hasina Wazed, SMMAB, Solar Module Manufacturers’ Association of Bangladesh, solar rooftops

Industry representatives call for a $59 million, five-year package of grants, loans and tax incentives from the government after Dhaka extended a coronavirus-driven industrial shutdown into the middle of the month.Solar manufacturers in Bangladesh have asked for government support after being crippled by a 40-day...

Read More

Meyer Burger mulls gigawatt-scale German solar fab

  |   Coal phase-out, floating solar on vast coal pit, heterojunction solar cells, Highlights, HJT, Meyer Burger, Modules & Upstream Manufacturing, Oxford PV, photovoltaic, photovoltaics, PV, PV modules, REC Group, Solar, Solar Cells, solar energy, solar industry, solar manufacturing, solar panels, Solar PV, Sustainability, Utility Scale PV

Chief executive Gunter Erfurt told a German radio station a solar factory in North Rhine-Westphalia could supply high-efficiency panels for a 10 GW floating solar project on the vast Hambach open-cast coal mine.From pv magazine Germany. Swiss solar production equipment maker Meyer Burger is considering establishing...

Read More