17627
post-template-default,single,single-post,postid-17627,single-format-standard,elision-core-1.0.10,everest-forms-no-js,ajax_fade,page_not_loaded,qode-child-theme-ver-1.0.0,qode-theme-ver-4.4,wpb-js-composer js-comp-ver-6.3.0,vc_responsive
Title Image

Blog

3-MW Taos solar array now online in Kit Carson Electric Cooperative district

  |   Solar, solar industry

In its continued effort to achieve 100% daytime solar energy by 2022, Kit Carson Electric Cooperative (KCEC) announced that its largest solar array has come online. Located near the Town of Taos Water Treatment Plant, the Taos solar array is 3 MW and will serve KCEC’s largest substation and member base. The Taos array marks…

The post 3-MW Taos solar array now online in Kit Carson Electric Cooperative district appeared first on Solar Power World.