Installation & Commissioning
Equipment Delivery
Our efficient logistics companies deliver in a timely fashion & excellent condition. Consulting with client, all the equipment is stored in a safe place.
System Integration
Site supervisors guide and explain the system to the installers. Design and timeline charts are followed religiously for quick and neat installation.
Commissioning
System is made live after thorough checks including safety, performance & sturdiness. Report & statistics are generated and submitted to the client.
Net Metering
A Net meter is installed replacing the existing meter of the client so that surplus energy can be exported to the grid and imported back whenever required.
Our Meticulous Installation
Installation & Commissioning
Our work discipline sets up apart
Material Procurement & Delivery
As soon as an order is passed, a plan is made to procure equipment according to the timeline of the project.
Structure Installation & Module Mounting
Rooftop is cleared of debris and mounting structure is first installed. Following completion, modules are mounted on the structure.
Inverter & B.O.S. Integration
After rooftop work is done, Inverter is installed in a dry, well ventilated area with easy access for O&M. Simultaneouly the rest of the system is installed.
Testing & Commissioning
After all the equipment have been installed, a thorough check is done to ensure proper fittings and inter-module connection. The system is then made live and checked for all parameters.
Our site engineers always make sure the checklist is followed.
Fittings & interconnections are tight.
All the equipment has been installed according to its respective manual
All the alignment and level are proper.
Cable routing is carried out neatly.
Our Engineers commit rigorous testing after the system is made live.
All the electrical parameter are checked.
System is checked for structural integrity.
Performance of the system is measured.
All safety features are tested.
Before the system is installed, all the necessary permissions are sought.
System is santioned by discom before installation.
After installation, Work Completion Report is issued by DISCOM.
Bi-directional meters are purchased and tested.
Bi-directional meters are installed at the premises replacing the existing meters.
Words we live by
"The will to win, the desire to succeed, the urge to reach your full potential... these are the keys that will unlock the door to personal excellence."
Dante Remus"The will to win, the desire to succeed, the urge to reach your full potential... these are the keys that will unlock the door to personal excellence."
John